Projects
These are a few of our recently completed Projects of some the different supply and installation services we offer
Bidvest Greenstone
Fourways Shutter Installation
Ambient Aluminium Security Shutters fitted in Fourways
Office Installation In Randpark Ridge
A combination of Fin Oak Engineered Flooring and Belgotex ‘Design Touch Chaos’ George’.
IQOS Sandton City
3/14mm Engineered Wood
PSG; Constantia Office Park
Delano and Expona Vinyl Planks, Belgotex Diagonals and Fringe Carpet Tiles
The Fun Co Menlyn
The Fun Co Menlyn and MINOPEX Projects, these were probably the most challenging project to date as we had certain time limits to get them completed.
There were 2 LVTs’ (Luxury vinyl planks) used, the first one was a more resilient product, used on the train track, the train being imported from Italy, with rubber wheels.
The challenge was the setting out of the “Curve” and maintaining it, from a looks point of view, we had to lay the pattern and then cut the curve.
The other areas were reasonably trouble free, from an installation point of view
The “herringbone” design was also hassle free, as both products, lend itself to this design.
Various other challenges were power outages for long period of times and working with head lamps to keep time lines in place.
We had a huge storm one night and being a new wing on menlyn, part of the roofing collapsed and a huge amount of water
flooded part of the train track. Being a glue down product, it think out of 150m2 , only 5 planks were replaced.
We had “Fun” excuse the pun, doing the mini golf layout, having to put in 2 thicknesses of artificial grass, the “Fairway” and “Rough”, this was a great success. The islands were also laid in artificial grass, We had to work in relays to keep to time lines and my crews stayed in a lodge nearby, having easy access to the site.
I suggest a visit to the ‘Fun Company’, as there is loads to do for both adults and children alike.
MINOPEX
Installation of 400m2 Berberpoint 920 Carpet Tiles in 2 colours, design and colours to match other Floors installed by Bonetts Interior Projects last year. To keep Time frames in place installation had to be carried out on a weekend.